A lender-ready construction budget is a line-by-line estimate of every hard cost, soft cost and contingency, tied to a realistic timeline and backed by contractor bids. It shows the lender exactly what the money buys, when each dollar is needed, and that the project still makes sense if something goes wrong.


At Cutter Hill Capital, the budget is the document we spend the most time on. A comprehensive budget that is provided early in the loan process will get a term sheet issued more quickly. A poorly constructed budget creates questions, and questions slow down closings.


Cutter Hill Capital will provide a budget template to borrowers to ensure they have considered all possible expenses related to the project.


Why does the construction budget matter so much to a lender?


The budget determines how much you can borrow, how draws are released, and whether the deal works on paper. With hard money, the property and the plan carry more weight than your tax returns, so the budget is the plan.


A lender uses your budget to:


  • Size the loan. Purchase price plus construction budget equals total project cost, which drives loan-to-cost. Cutter Hill Capital funds up to 90% of cost, subject to a 70% cap on the finished value.
  • Test the exit. Total cost compared to after-repair value (ARV) shows whether there is enough margin to sell or refinance.
  • Evaluate the builder. A detailed, realistic budget shows the lender that the borrower has taken time to review and analyze the deal with a high level of organization, all of which are critical to a successful project.


What should a construction budget include?


Every cost from permit to final cleaning, broken out by phase, with a source for each number. If a lender has to guess what a line covers, it will slow things down.

CategoryTypical line itemsWhat the lender checks
Site workDemolition, excavation, utilities, septic or sewer tie-in, drivewaySite conditions, ledge, wetlands, utility access
FoundationFootings, foundation walls, waterproofing, slabMatches plans and soil conditions
Framing and exteriorFraming, sheathing, roofing, windows, doors, sidingCurrent lumber and material pricing
Rough-insPlumbing, electrical, HVAC, insulationLicensed subs and bids attached
Interior finishesDrywall, flooring, cabinets, counters, tile, paint, trimFinish level fits the ARV and the town
Fixtures and appliancesLighting, plumbing fixtures, appliancesAllowances that are realistic, not placeholders
Landscaping and finalGrading, landscaping, cleaning, punch listOften underbudgeted, so it gets a second look
Soft costsArchitect, engineering, permits, surveys, insurance, utilities during constructionPresent and complete
ContingencyUnexpected costsUsually 5% to 10% of hard costs

Attach bids or quotes wherever you can. A budget backed by signed subcontractor numbers is far more convincing than round estimates.


What is the difference between hard costs and soft costs?


Hard costs are the physical build: labor and materials that go into the structure and the site. Soft costs are everything else it takes to get there: design, engineering, permits, insurance, surveys and utilities during construction.


Builders rarely miss hard costs. Soft costs are where budgets come up short, especially permit fees, engineering revisions and the cost of carrying the project if it runs long. Soft costs also include insurance, taxes, and utilities.


How much contingency should a construction budget have?


Most lenders want to see a contingency of 5% to 10% of hard costs, with the higher end for teardowns, older homes, and sites with unknowns. A budget with no contingency tells a lender the builder is very confident, well capitalized to cover overages out of pocket, or is inexperienced.


Builders often rely on costs from prior projects to estimate budgets for new projects. This is a good starting point, but material costs have fluctuated significantly in the wake of economic turbulence. Without direct quotes from the suppliers, the best way to account for potential material cost increases is to include an appropriate contingency.


On the South Shore and in older New England towns, common surprises include ledge during excavation, failed septic or Title 5 issues, and conservation commission conditions that add time and cost.


What are the most common construction budget mistakes?


Most budget problems come from optimism, not math. These are the ones that slow approvals or cause trouble mid-project:


  • No contingency. Or one so small it won't cover a single surprise.
  • Missing soft costs. Permits, engineering and insurance left off or lumped into one guess.
  • Stale pricing. Material and labor numbers from an old project or last year's bids.
  • No timeline. A budget without a schedule makes it hard to plan draws or estimate interest.
  • Forgetting carrying costs. Interest, insurance, taxes and utilities while the project is under way and on the market.
  • Finishes that don't match the market. The quality of the finish materials needs to be appropriate for the neighborhood and target price point.


How do lenders review a construction budget?


The lender compares your numbers to the plans, local pricing and comparable sales, then turns the budget into a draw schedule. Expect questions on any line that looks high, low or vague.


A typical review covers:


  • Completeness. Is every phase covered, including soft costs and contingency?
  • Pricing. Do the numbers match current costs in that town, and are bids attached?
  • Feasibility. Does total cost leave enough margin against the ARV?
  • Timeline. Is the schedule realistic for the scope, permits and season?


Once the loan closes, the budget becomes the roadmap for draws. Before each draw, the lender confirms the work is complete, then releases funds, often within 1 to 2 days. Keeping your budget organized by phase makes every draw faster.


Construction budget checklist


Before you send a budget to a lender, make sure you have:


  • Every phase broken out by line item
  • Soft costs listed separately
  • Contingency of 5% to 10% of hard costs
  • Contractor and subcontractor bids attached
  • Finish allowances that match the target sale price
  • A construction timeline by phase
  • Plans, specs and permit status
  • Comparable sales supporting the ARV


Frequently asked questions

Do I need contractor bids to get a hard money construction loan?

Bids aren't always required, but they make approval faster and more certain. At minimum, have bids for the largest line items.

Can I act as my own general contractor?

Often yes, if you have the experience and license. Expect the lender to look closely at your track record and budget detail.

What if my costs change after closing?

Talk to your lender early. Budget reallocations between line items are often workable when you communicate before the money is spent.

How do I access the contingency funds?

First, a contingency figure must be included on the final budget prior to closing. If it is on the budget, these funds can be accessed for overages on any other line item on the budget or for an unexpected new expense that was not on the final budget.

How does my budget affect how much I can borrow?

Total project cost drives loan-to-cost, and the finished value drives loan-to-value. Cutter Hill Capital funds up to 90% of cost, subject to a 70% cap on the after-repair value.


New to hard money construction loans? Start with our guide: How Hard Money Construction Loans Work in Massachusetts.


About Cutter Hill Capital


Cutter Hill Capital is a private real estate lender based in Hingham, Massachusetts, funding builders, developers and investors across greater New England. We make decisions locally, close quickly and fund draws on time, so your project keeps moving.


Have a project in mind? Send us the address, purchase price and budget, and we will get back to you with preliminary terms within 24 hours.

Request more information

If you would like to apply for a Construction &/or Renovation loan, or any other types of loans we offer, please fill out a quick form today.